We are looking at changing our existing structure to do a much more detailed breakdown. I am trying to find out if there is a limit to how many cost codes/phase ID's you can have in a list in Sage 50 2013 So basically my question is : How many cost codes and phase codes can you have in Sage 50 without causing operational issues? Thank you for any assistance.
↧